Notice Periods in Europe: Why Your New Engineer Starts in 3 Months

If you sign an offer with a senior engineer in Germany or France in January, there is a good chance they do not write a line of your code until April. That is not a slow candidate or a weak recruiter. It is the notice period — and in most of Europe it is set by a combination of statute, the employment contract, and sometimes a collective agreement, none of which your offer letter can override.

The practical consequence: the gap between "offer accepted" and "first commit" varies from about two weeks to about six months depending on which country and which seniority band you are hiring into. If you plan capacity as though everyone starts in two weeks, every roadmap built on that assumption is wrong by a quarter.

Three layers decide the date, not one

Almost every mistake in this area comes from reading only the first layer.

Statutory minimum. Each country sets a floor. In Poland it scales with tenure — roughly two weeks under six months of service, one month under three years, three months beyond that. In Turkey the statutory scale runs from two weeks to eight weeks across the same kind of tenure bands. In the UK the statutory minimum for an employee resigning is one week after a month of service, which sounds wonderfully fast and is almost never what actually applies.

The contract. This is the layer that governs in practice, because contracts routinely set longer periods than the statute. A UK senior engineer is far more likely to have one or three months written into their contract than the statutory one week. A German contract for a lead or architect frequently specifies three months to the end of a calendar quarter — which means a resignation submitted on October 2 can produce a start date of January 1. The same clause in a different contract might read "to the end of the month," and the difference between the two is up to two and a half months of your runway.

Collective agreements. In France, the applicable convention collective typically sets three months for cadre status, which covers most experienced engineers. In Sweden, the Nordic countries generally, and parts of Italy and Spain, sector agreements can modify what the law says. Your candidate often does not know which agreement covers them. Their HR department does.

So when a candidate says "I think it's a month," that is a hypothesis, not a fact. The only reliable source is the signed contract in their drawer. Ask them to check it before you commit to a start date with your own stakeholders.

A rough map of the markets we hire in most

Treat these as planning assumptions to verify, not legal advice. Contracts override, collective agreements override, and individual tenure shifts the bands.

  • Germany — statutory four weeks to the 15th or end of month for employees, but mid-to-senior contracts commonly specify three months, often to quarter end. Plan for three months on anything senior.
  • Poland — tenure-based: two weeks, one month, or three months. Most engineers with three or more years at their employer are in the three-month band.
  • Netherlands — one month is the common employee notice; contracts can extend it, with corresponding obligations on the employer side.
  • Portugal and Spain — shorter than the German-speaking markets. Thirty to sixty days in Portugal depending on tenure, and Spain often lands near fifteen days statutory, with contracts extending it for senior roles.
  • Romania, Bulgaria, Czechia — Romania caps employee resignation notice at twenty working days for non-management roles and forty-five for management. Czechia commonly runs two full months. Bulgaria is typically one month.
  • UK and Ireland — contract-driven. One month for mid-level, three months for staff and above, occasionally six for executives.
  • Turkey — two to eight weeks on the statutory scale, which in practice makes it one of the faster markets to start someone in, especially compared with Germany or France at the same seniority.

The pattern worth internalizing: in Central and Northern Europe, notice tends to grow with tenure and seniority and is measured in months. In Southern Europe, Turkey, and much of the Balkans, it is measured in weeks. That difference is a real, if unglamorous, factor in where you place a team — and it is one of the reasons building a dedicated team in a nearshore market can close a capacity gap faster than hiring the same profile in a long-notice country.

Seniority makes it worse, and executive hiring makes it much worse

The more senior the role, the longer the clause. Directors and VPs routinely carry three to six months, sometimes with garden leave attached — the employer pays them to stay home rather than work out the notice, which protects the incumbent but does nothing for your start date.

This is why director and C-level searches need to be scoped backwards from the date the person must be in the seat, not forward from the date the req opens. A six-week search plus a four-month notice plus a two-week handover is roughly half a year. If the board expects a new CTO before the next funding milestone, the search needs to start two quarters early, not two months.

What actually shortens the gap

You cannot negotiate away a statutory floor. You can sometimes shorten everything above it.

  • Ask the candidate to negotiate a release. Many employers will agree to cut notice short, particularly if the handover is clean and the replacement plan is already underway. Candidates are often reluctant to ask. Encourage them, and ask them to ask early — a request made in week one of notice lands better than one made in week six.
  • Offer unused vacation as a bridge. In several markets, accrued leave can be taken during notice, which brings the effective last working day forward. Whether this is possible depends on local rules and the employer's goodwill.
  • Use the window instead of wasting it. A three-month notice is three months of pre-onboarding you are not using. Ship the laptop early. Add them to a read-only Slack channel. Send the architecture docs. Candidates who feel connected during notice are far less likely to take a counteroffer in week eight.
  • Sequence your pipeline for it. If you need someone in six weeks and your strongest candidate is on three months, you need a parallel track, not hope. Technical and specialist recruitment that runs multiple finalists to offer stage exists partly for this reason.

The risk nobody prices in: the counteroffer window

A three-month notice is a three-month window in which the current employer can change its mind about what this person is worth. Long notice periods correlate with offer reneges, and the reneges cluster in the first two weeks of notice and the last two.

The defense is not a bigger salary number. It is contact. A hiring manager who checks in every two weeks with something real — a design doc, a question about a technical decision, an invitation to the team offsite — keeps the new role psychologically live. A company that goes silent for ninety days and then emails a laptop shipping confirmation has effectively invited the counteroffer in. This is also where your culture and employer brand work earns its keep, because what the candidate is weighing during notice is not compensation, it is which team they would rather be on.

Build the calendar backwards

For each open role, write down four numbers before you open the req: search time, interview time, notice period for that country and seniority band, and ramp time to first meaningful contribution. Add them. That total, not the search time, is what you communicate to the people depending on this hire.

If the number is unacceptable, you have three real levers — change the market, change the seniority, or change the delivery model. Pretending the notice period will be shorter than it is has never worked. If you are weighing those trade-offs across several countries at once, we can walk through the specific markets you are considering.

← All posts